| Length of Bridge: |
80 mt |
| Height of Bridge: |
6 mt |
| RC Piles (Dia. 1000 mm): |
1.850 mt |
| Prestressed Beams ( L: 20 mt): |
48 ea |
| Excavation: |
107.000 m3 |
| Filling & Compacting: |
53.000 m3 |
| Subbase: |
12.000 m3 |
| Base: |
19.000 tn |
| Sidewalks: |
9.000 m2 |
| Curbs |
13.000 mt |
| Formwork: |
11.500 m2 |
| Scaffolding: |
1.600 m3 |
| Rebar: |
640 tn |
| Concrete: |
5.500 m3 |
| Sewerage and Storm water lines (Dia 300/600 mm): |
2.600 mt |
| Electrical Cabling (LV / MV): |
3.100 mt |
| Street Lighting Pole: |
42 ea |
| Grassing: |
53.000 m2 |
| Planting: |
21.000 ea |
| Sprinkler system: |
14.500 mt |