Project Information
Project Name: | Ankara Creek 185 & 94th Street Bridges and Road Project |
---|---|
Location: | Ankara / Turkey |
Client: | ABB - Ankara Metropolitan Municipality |
Scope of Work: | Bridge, Road, Infrastructure and Relocation of Pipeline Works |
Project Details
Number of Bridge: | 2 ea |
---|---|
Length of Bridges: | 42 mt |
Height of Bridge (average): | 4 mt |
RC Piles (Dia. 1000 mm): | 3.100 mt |
Prestressed Beams ( L: 21 mt): | 144 ea |
Excavation: | 12.100 m3 |
Filling & Compacting: | 10.000 m3 |
Subbase: | 5.000 m3 |
Stone Retaining wall: | 1.000 m3 |
Sidewalks: | 900 m2 |
Curbs: | 4.000 mt |
Formwork: | 3.300 m2 |
Rebar: | 1.000 tn |
Concrete: | 4.700 m3 |
Storm water lines (Dia 400/600 mm): | 1.600 mt |
Relocation of 6" NATO Petroleum Pipeline: | 1.100 mt |